Thanks guys!
It didn’t go as I’d hoped, but I think it went well!
I ended up talking to a gaffer at the rental house and he suggested hanging some 60w tungsten bulbs from the ceiling using gaff tape (for the locker room scene).
I went with that idea and I liked how it was looking, but on the time of the scene I could one get one bulb on and one section of overhead fluorescent lights in the room wouldn’t turn off for some reason, maybe emergency lights? Anyway, I still liked the way it looked for the most part, just wish we weren’t rushing through everything.
Ill post a few frames in a little bit.
The majority of the time we were so tight on time that I didn’t have anytime to add or tweak lighting which was a real bummer. I think the director was probably a little too ambitious with the schedule.
We didn’t end up finishing, so we’re getting the last couple scenes this weekend, which is good because I might actually have time to light them!