All of the rental houses are saying you don't need crystal. I know it has probobly been a while since you have been in a similar situation, but it is hard to argue with these guys when you are young, and have different information than they are acustomed to.
Affraid is an interesting choice of words, however, I have budget concerns when shooting a student film which don't allow for all of the distro gear and extentions needed to get something that loud far enough away. I also don't have the man power in my lighting crew to move something of that size.
I was also told today by an nyc rental house that a 2k generator won't hold a 1.2K HMI. It is hard for me to know whether they are trying to take advantage of me, or whether I actually do need a larger generator. This information goes against everything I have learned, because even with the amprage required for the initial strike, the .8K should be plenty of room powerwise. Am I being swindled, or is 2K too small for a 1200 HMI?